Test-cell power and control line-up for a factory drive test floor
Eight UL 508A assemblies, 690 V and 480 V, PLC/HMI, staged delivery and commissioning. 2025.
Outdoor network cabinets for a utility communications program
Well over 100 NEMA 4 cabinets built, tested, serialized and shipped in repeat batches for an industrial networking OEM. 2024–2026.
Shock-rated heater control panels, built to print
About 190 panels built to the customer's drawings in batches, with a test record for every panel. 2024–2026.
Generator source alarm panels for a standby-power dealer
Panels designed to each job's specification, with submittal drawings, and a NEMA 4X termination panel. 2025–2026.
Long-running controls supply for a dairy and farm equipment OEM
Junction boxes, pre-programmed operator panels and drives, depot repair and an obsolete-drive cross-reference. 2012–present.
UL 508A control box for a robotic work cell on a deployment deadline
Built around the customer's safety and control kit, UL-inspected in our shop, at the site the next morning. 2025.
Transfer-switch and breaker enclosures for standby-power installations
An enclosed 200 A manual transfer switch and dual-breaker enclosures, with a NEMA 3R version scheduled to ship in late 2026. 2024–2026.

Engineering, DCS and component-supply projects
Work led by our engineering team. The full stories are on grossengineering.com.
Freelance DCS control panels for a high-power test facility
I/O and electrical design, panel build and staged delivery, through to as-built terminal maps; programming under way. 2025–2026.
More than fifteen years of DCS support at a chemical plant
Panels, I/O migration, Freelance programming, shutdown support and training since 2009.
Freelance controls for a cultures producer's freeze dryers
Built in 2022–23 and maintained hands-on; an extension for another dryer was ordered in 2026.
Relay-panel equipment package for a municipal substation upgrade
Specification review, sourcing and an engineered nameplate package, won on sealed bids. 2025–2026.
Where our panel shop began: a 32-axis motion retrofit
The project that gave us an engineering group and a panel shop. 2007–2016.